Owner: Kuwait's Ministry of Public Works
Main Contractor: China Railway No.05 Engineering Group Co,Ltd.
Project Brief: Total cost 66 million KWD which connects the Highway Fahaheel to KBD area along the 22 km It includes a seventh intersections in addition to develop the seventh ring road for free traffic without any optical signals with the existence of waiting for trucks and pedestrian bridges places.
Category : Bridges
Country : Kuwait
System Used :
ACROW SHORE BRACE TABLE FORM FOR SUPER STRUCTURE FORMWORK
Year : 2016 to 2016