Concrete Prefabricated Scuppers

It must be said that the development of this wadi has long been a concern for the authorities.like a mega site about 40 billion dinars.

 The three sources of pollution (urban, industrial and agricultural) have always led to its management. Four industrial zones with 473 units are located on 740 ha, or 9% of the urbanized areas of the province of Algiers.

 In this area, only 30% are now connected to wastewater treatment plants. Add to that the major flooding which reached a hundred-year flood flow 2500m3 / second

Category : Buildings

Country : Algeria

System Used :
BIG STEEL PANELS

Year : 2015 to 2016

Project Images