ACCB 240

Overview Advantages

- The ACCS 240 climbing scaffold system is normally used as shoring in order to support
anchored wall formwork in accordance with EN 12812.
- The formwork is firmly connected with the scaffolding and is moved as a crane-unit
suspended on a crane.
- It can also be used as working scaffold only. The working platform for operating the
formwork consists of planking, platform beams and two fixed climbing brackets.
- The brackets transfer the loads deriving from the dead weight, live loads and prevailing wind loads via the anchorage and bottom pressure point into the structure.